Bathroom Remodel Planning Guides

Free checklists, measurement templates, budget worksheets, and timeline planners to organize your Sacramento bathroom remodel from start to finish.

Project Planning Checklist

Use this checklist to stay organized from your first design idea through project completion. Sacramento bathroom remodels typically take 3–6 weeks, and proper planning prevents costly surprises.

Define your goals — cosmetic refresh, full remodel, or layout changeVision
Set a realistic budget range (Sacramento average: $15,000–$45,000)Budget
Research and interview at least 3 licensed contractorsContractor
Verify contractor license on cslb.ca.govContractor
Check contractor reviews on Google, Yelp, and BBBContractor
Request and compare detailed written estimatesBudget
Decide on fixtures: toilet, faucets, showerhead, lightingDesign
Choose materials: tile, countertop, cabinetry, flooringDesign
Select a color palette and finish style (chrome, brushed nickel, matte black)Design
Confirm permit requirements with Sacramento Building DivisionPermits
Plan for a temporary bathroom during constructionLogistics
Clear out existing bathroom completely before start dateLogistics
Confirm project timeline and start date with contractorTimeline
Review and sign contract with scope of work and payment scheduleContract
Protect adjacent rooms from dust and debris during demoLogistics

Measurement Guide

Accurate measurements save time and money. Measure twice before your contractor visit — having these ready makes your free consultation more productive and your estimate more accurate.

Room Dimensions

  • Overall length (wall to wall)_____ in.
  • Overall width (wall to wall)_____ in.
  • Ceiling height_____ in.
  • Door opening width and swing direction_____ in.

Existing Fixtures

  • Toilet rough-in distance (wall to center of drain)_____ in.
  • Vanity width, depth, and height_____ in.
  • Tub/shower length and width_____ in.
  • Distance from each fixture to nearest wall_____ in.

Windows & Doors

  • Window width and height_____ in.
  • Window sill height from floor_____ in.
  • Distance from window to nearest corner_____ in.
  • Door frame width and height_____ in.

Plumbing Locations

  • Water supply line positions (hot and cold)_____ in.
  • Drain locations for sink, tub, and toilet_____ in.
  • Vent pipe location_____ in.
  • Water heater distance from bathroom_____ in.

Electrical

  • Outlet locations and heights_____ in.
  • Light switch positions_____ in.
  • Exhaust fan location_____ in.
  • Distance from outlets to water sources_____ in.

Pro tip: Take photos of your current bathroom from multiple angles. Include close-ups of plumbing access panels, electrical panels, and any existing damage. Bring these to your consultation for the most accurate estimate.

Budget Worksheet

Sacramento bathroom remodels typically range from $15,000 to $45,000 depending on scope and materials. Use this breakdown to plan your budget by category.

CategoryTypical Range% of BudgetNotes
Demo & Disposal$800–$2,0005–8%Removing old fixtures, tile, drywall
Plumbing$1,500–$4,50010–15%New supply lines, drains, fixture hookups
Electrical$800–$2,5005–10%GFCI outlets, lighting, exhaust fan
Tile & Flooring$2,000–$6,00012–18%Floor tile, shower walls, backsplash
Vanity & Countertop$1,200–$4,0008–12%Cabinet, countertop, sink, faucet
Shower/Tub$2,500–$8,00015–25%Shower pan, glass door, fixtures, waterproofing
Toilet$300–$1,2002–4%Comfort-height, dual-flush, elongated
Lighting & Ventilation$400–$1,5003–5%Vanity lights, recessed cans, exhaust fan
Paint & Finish Work$500–$1,5003–5%Moisture-resistant paint, trim, caulking
Permits & Inspections$300–$8002–3%Building, plumbing, electrical permits
Contingency (10–15%)$1,500–$6,00010–15%Unexpected issues: water damage, mold, code updates

Important: Always budget 10–15% contingency for unexpected issues discovered during demolition — hidden water damage, outdated wiring, or mold are common in Sacramento homes built before 1990.

Timeline Planner

A standard Sacramento bathroom remodel takes 3–6 weeks from demolition to final inspection. Here's what to expect at each phase.

1

Planning & Design

2–4 weeks
  • Finalize design and materials
  • Obtain permits
  • Order fixtures and materials
  • Schedule project start date
2

Demolition

1–2 days
  • Remove old fixtures and tile
  • Inspect for hidden damage
  • Address any mold or water damage
  • Haul away debris
3

Rough-In Work

3–5 days
  • Plumbing rough-in and inspection
  • Electrical rough-in and inspection
  • Framing modifications if needed
  • Install waterproof membrane
4

Tile & Surfaces

3–5 days
  • Install backer board
  • Lay floor tile
  • Tile shower walls and pan
  • Grout and seal
5

Fixture Installation

2–3 days
  • Set vanity and countertop
  • Install toilet
  • Mount shower fixtures and glass
  • Wire lighting and exhaust fan
6

Finishing

1–2 days
  • Paint walls and ceiling
  • Install mirrors, towel bars, accessories
  • Final plumbing and electrical connections
  • Caulk all joints and transitions
7

Final Inspection

1 day
  • City inspector walkthrough
  • Punch list review with contractor
  • Final cleaning
  • Project handoff and warranty review

Material Selection Quick Reference

Choosing the right materials affects durability, maintenance, and budget. Use this quick reference when shopping or comparing contractor proposals.

Countertop Comparison

Quartz$50–$120/sq ft | Zero maintenance
Granite$40–$100/sq ft | Annual sealing
Marble$60–$150/sq ft | High maintenance
Solid Surface$30–$80/sq ft | Low maintenance

Tile Comparison

Porcelain$3–$15/sq ft | Best for wet areas
Ceramic$2–$10/sq ft | Budget-friendly
Natural Stone$8–$30/sq ft | Luxury look
Glass Mosaic$10–$35/sq ft | Accent areas

Shower Door Options

Frameless Glass$800–$2,500 | Modern, open feel
Semi-Frameless$400–$1,200 | Balance of style & cost
Framed$200–$600 | Most affordable
Sliding/Bypass$300–$900 | Space-saving

Fixture Finishes

ChromeAffordable | Easy to clean
Brushed NickelHides water spots | Timeless
Matte BlackTrending | Bold statement
Brushed GoldLuxury feel | Warm tone

Want a Plan Tailored to Your Bathroom?

These guides cover general planning. For a detailed scope-of-work, accurate measurements, and a fixed-price estimate specific to your Sacramento home, schedule a free in-home consultation.