Master Bathroom Remodel · El Dorado Hills · El Dorado County
Master Bathroom Remodel in El Dorado Hills, CA
Primary-suite renovations built for Serrano custom villages, Promontory Villa Lago estates, Blackstone homes and the broader El Dorado Hills executive-home market.
Master bathroom in El Dorado Hills at a glance
What a Primary-Suite Remodel in El Dorado Hills Actually Involves
Investment & timeline
- Engine range: $24,000 – $86,500+
- Typical EDH scope: upper half of that range (bigger rooms, higher finish spec)
- Timeline: 4–6 weeks of work after permit issuance
- Permit lead time: 1–2 weeks (county plan check)
- Line-item estimate: written and itemized, not lump sum
What EDH owners usually specify
- Freestanding soaker tub (replacing drop-in)
- Separate curbless walk-in shower
- Dual vanity with quartz or quartzite top
- Large-format porcelain or marble-look tile
- Frameless glass enclosure
- Radiant electric floor under new tile
- LED-lit mirrors with anti-fog
- Matte-black or brushed-gold fixtures
- Optional: steam shower on dedicated 240 V branch
By community
How Primary-Suite Scope Varies Across El Dorado Hills Communities
Serrano
Custom villages carry the largest primary suites in EDH. Early (1996–2005) homes often get full tear-out of travertine and framed glass; new villages (Villadoro, Village C2/J/K) typically get targeted upgrades on an already-modern layout.
The Promontory
Villa Lago (Toll Brothers) carries the highest-end primary suites in Promontory — commonly the most ambitious scope on this page: freestanding tub, steam shower, radiant floor, zellige accents.
Blackstone
2007+ Lennar, Taylor Morrison, Meritage and New Home Company builds. Primary suites are already modern; typical scope is quartz top upgrade, freestanding tub swap, frameless glass, steam.
Four Seasons (55+)
K. Hovnanian 2004–2009. Primary bath remodels here almost always add aging-in-place features: curbless shower, grab-bar blocking, comfort-height toilet. See our aging-in-place page for the full universal-design spec.
Questions? Talk to a bathroom remodeling expert today.
(916) 907-8782Code specifics for primary suites
2025 CA Code Points That Matter for an EDH Primary-Suite Remodel
Permit applications filed on or after January 1, 2026 are governed by the 2025 California Building Standards Code, which adopts the 2023 NEC. For an El Dorado Hills primary-suite scope, three code points come up most often:
- GFCI protection expanded to 125–250 V (NEC 210.8(A)). If your scope includes a steam generator or whirlpool pump on a 240 V branch, the circuit now has to be GFCI-protected. This is new in the 2023 NEC and surprises homeowners whose existing 240 V branch isn't protected.
- Exhaust fan 50 CFM intermittent / 20 CFM continuous, ducted outside (Title 24 / ASHRAE 62.2). Larger primary suites may need a higher-CFM fan sized to the room volume; humidity-sense logic is the spec we recommend (Panasonic WhisperSense or equivalent, which satisfies CALGreen §4.506.1).
- All new bathroom lighting must be high-efficacy per Title 24 Part 6. LED fixtures satisfy this by default. For primary suites specifically, we spec ~50–75 lumens per square foot (versus the ~25 lumens per sf in a builder bath) because vision changes with age and lower lighting makes shaving and makeup difficult.
For the full code block (TR receptacles, AFCI non-requirement, CALGreen fan, flood-zone context) see the main El Dorado Hills bathroom remodeling page.
Other El Dorado Hills bathroom services
Not a Full Primary Suite?
If your scope is tighter than a full primary-suite remodel, these are the other El Dorado Hills service pages:
Steam Shower
240 V generator, vapor seal, enclosure spec.
Walk-In Shower
Curbless build, bench, drain, frameless glass.
Tub-to-Shower Conversion
Replace drop-in or alcove tub with a shower.
Aging-in-Place
Whole-room universal design for 20+ years.
Back to the full El Dorado Hills bathroom remodeling page.
EDH Master Bathroom Remodel FAQ
Ready to plan your El Dorado Hills primary-suite remodel?
Free in-home consultation, line-itemed written estimate, and the El Dorado County permit filed under license #1125321.